Corporate defendant on trial — presumption of innocence (as of 24 November 2026)
Integrated Energy BV SPV sh.p.k. has been under preventive seizure since 28 July 2023 (GJKKO Decision No. 95) and was sent to trial by SPAK as a legal entity on 2 July 2026 on charges of aggravated fraud and money laundering. It remains presumed innocent pending a final court verdict. (2026-11-24)

Integrated Energy BV SPV sh.p.k. is the Albanian special purpose vehicle (SPV) established to execute the 30-year public-private partnership (PPP) concession for the Sharra landfill and waste-to-energy incinerator in Tirana.[1] Formally owned through a two-tier Dutch holding structure under parent company Geogenix BV, the concessionaire was identified by Albania's Special Structure against Corruption and Organized Crime (SPAK) as being de facto controlled by businessmen Mirel Mërtiri and Klodian Zoto.[1] Placed under preventive seizure by GJKKO on 28 July 2023, the company was indicted as a legal entity on 2 July 2026 alongside principal subcontractor Integrated Technology Services sh.p.k. (ITS) and 12 individuals in absentia.[2]

Concession contract and corporate structure

Under Concession Contract No. 6597, signed on 31 August 2017 with the Ministry of Environment, Integrated Energy BV SPV undertook to build a landfill, construct a municipal waste incinerator, and rehabilitate existing Sharra dumpsites for a planned investment of €128,248,330 excluding VAT.[1][3] Article 7.1.2 guaranteed three revenue streams: a €29/ton (excl. VAT, inflation-indexed) tipping fee paid by Tirana County municipalities, electricity sales at €70/MWh, and recycling revenues.[1][3] According to Ministry of Finance reporting analyzed by Open Data Albania, the company did not secure a construction permit for the incinerator until 24 November 2020—over three years after signing.[3]

Corporate management included former administrator Arjola Kodra, executive Denisa Tollkuçi, and foreign corporate officers Giuseppe Ciaffaglione, Marc Lapat, and Michael Druijts—all of whom were indicted in absentia on 2 July 2026.[2]

Financial balance and preventive seizure (2017–2023)

Between 2017 and 2023, Integrated Energy BV SPV collected 11,319,754,405 ALL (approximately €104 million at historical exchange rates per BIRN, or ~€120 million at 2026 exchange rates per SPAK) and contracted €12.9 million in bank loans (of which €8.8 million remained unpaid).[1][2] Despite these inflows, forensic records show the company executed only €21,017,157 in real on-site investment (16.4% of planned investment excl. VAT) and never constructed the incinerator.[1] When GJKKO Decision No. 95 placed the company under preventive seizure on 28 July 2023, only 4 million ALL (~€37,000) remained in its bank accounts.[1]

Alleged fund-draining mechanism and 2026 corporate indictment

In its 2 July 2026 indictment (Proceeding No. 255/2020), SPAK charged Integrated Energy BV SPV with aggravated fraud and money laundering in collaboration (Criminal Code Articles 143/3, 25, and 287).[2] Prosecutors allege that at least €30 million (1,283,390,609 ALL + €16,669,506) was fictitiously extracted and laundered while ~€70 million was disguised as operating and consulting expenses:[2]

  • Self-invoicing and ITS overpayments: 5.6 billion ALL (€51.5 million, 45.1% of total purchases) was recorded as self-invoicing, and 2.72 billion ALL (€25 million) was paid directly to Zoto's ITS (with total flows to ITS exceeding 3 billion ALL plus €6.7 million above an allegedly falsified subcontracting agreement).[1]
  • International transfers: Hundreds of thousands of euros were routed to Dutch parent Geogenix BV via Turkey and Lithuania under fictitious invoices tied to a €3.2 million flue-gas treatment contract, alongside €1.05 million to Bulgarian firm EM Capital Group AD and €490,000 to Swiss company 3DDD Swiss SA.[1]

See also

References

  1. ↑ a b c d e f g h i BIRN "Si u bënë tym milionat e djegësit fantazmë të mbetjeve në Tiranë" . BIRN Albania / Reporter.al. 2026-08-13 .
  2. ↑ a b c d e Press "Pastruan 30 mln euro, SPAK mbyll hetimet për inceneratorin e Tiranës, çon për gjykim të pandehurit" . Shqiptarja.com. 2026-07-02 .
  3. ↑ a b c Official Record "PPP incinerators, Financial Support from the State Budget over the years, 2015–2024" . Open Data Albania (AIS). 2022-03-23 .

Revision history

  • 2026-11-24 — Initial corporate profile covering Contract No. 6597, two-tier Dutch Geogenix BV ownership, 2017–2023 financial balance (11.32B ALL collected vs. €21.02M real investment and €37k cash at seizure), multi-layered fund-draining allegations, and the 2 July 2026 corporate indictment.