| HP Bigas dhe Veleshnje Energy | |
|---|---|
| Type | Special-purpose limited liability company (sh.p.k.) / Hydropower concessionaire |
| Industry | Small hydropower generation (planned Bigas 1, Bigas 2, and Veleshnje plants) |
| Founded | 27 September 2013 (registered in Berat, QKB NIPT L39604401K) |
| Status | Active corporate registration (per April 2024 QKB extract); HPP permits invalidated & unilateral contract termination initiated Feb 2018; administrative appeals ongoing in 2025–2026 |
| Headquarters | Berat, Albania |
| Key people |
|
| Owners / beneficial owners |
|
| Notable public contracts |
|
HP Bigas dhe Veleshnje Energy sh.p.k. (QKB NIPT L39604401K) is an Albanian special-purpose limited liability company registered in Berat on 27 September 2013 to develop and operate three small hydropower plants—Bigas 1, Bigas 2, and Veleshnje—in the Osum Canyons basin of Skrapar.[1][2]
Ownership and corporate structure
According to corporate registry extracts (QKB / OpenCorporates.al) and BIRN investigative reporting, HP Bigas dhe Veleshnje Energy sh.p.k. was established three weeks after the 6 September 2013 concession approval under Prime Minister Sali Berisha's outgoing cabinet.[1][2] The company is 100% owned by parent firm 2 AF sh.p.k.—whose sole shareholder is reported by BIRN as Erfan Feta—and managed by administrator Alban (Albano) Feta.[1] National Business Center records updated on 11 April 2024 confirm that the company maintained active corporate registration despite the cancellation of its Osum Canyons hydropower permits.[2]
Concession expansion and 2018 permit revocation
On 26 March 2015, the National Environment Agency (AKM) issued Preliminary EIA Decision No. 13 (ID No. 137) for Bigas 1 and Bigas 2 with a two-year validity clause (Clause 8.2) expiring on 26 March 2017 if construction did not begin.[3][4] On 16 May 2016, the Ministry of Energy and Industry under Damian Gjiknuri amended the concession contract, merging Bigas 1 and Bigas 2 and increasing total planned installed capacity from 0.5 MW to 1.2 MW.[5]
Although the National Territory Council (KKT) chaired by Edi Rama issued an unpublished development permit on 12 December 2017, media exposure in February 2018 over the expired EIA, Ilir Meta's March 2017 warning letter, and AKZM/KLSH findings of coordinate manipulation inside the Osum Canyons Natural Monument led to rapid revocation: Notice No. 638 suspended works on 9 February 2018, MTM Decision No. 1 invalidated the 2015 EIA on 15 February 2018, and MIE initiated unilateral contract termination under Article 12 on 19 February 2018.[1][6][7]
Administrative litigation (2018–2026)
Represented by attorney Anxhelo Feta (Haxhia dhe Hajdari), the company challenged the cancellation in administrative court, losing at the First Instance Administrative Court on 30 July 2018 and at the Administrative Court of Appeal on 7 March 2019 after a 26 December 2018 permit re-application using identical documents was rejected by AKZM.[5][8][9] Subsequent appellate filings against MTM, AKM, and AKZM seeking EIA approval continued through November 2025 and entered the Supreme Court of Albania deliberation docket in 2026 (Case No. 31001-00320-00-2026).[10][11][12] No public records indicate that the company initiated or won international investment arbitration.[13]
See also
References
- ↑ a b c d BIRN "Rama u paralajmërua nga Meta, por i firmosi HEC-et në Osum në dijeni të shkeljeve" . BIRN Albania / Reporter.al. 2018-02-09 .
- ↑ a b c Official Record "HP Bigas dhe Veleshnje ENERGY (NIPT L39604401K)" . OpenCorporates Albania / QKB. 2024-04-11 (QKB NIPT L39604401K) .
- ↑Press "Ekskluzive / Leja mjedisore e HEC-eve mbi kanionet e Osumit, e skaduar" . Top Channel. 2018-02-08 (AKM Decision No. 13 / ID No. 137 (26.03.2015), Clause 8.2; MTM Memo (08.01.2018)) .
- ↑Press "Gjykata rrëzon HEC-et mbi Kanionet e Osumit" . Gazeta TemA. 2018-07-31 (MTM Decision No. 1 (15.02.2018); AKM Decision No. 13/ID 137 (26.03.2015); Notice No. 638 (09.02.2018)) .
- ↑ a b BIRN "HEC-et në kanionet e Osumit; koncesionari sfidon kryeministrin në gjykatë" . BIRN Albania / Reporter.al. 2018-04-25 .
- ↑BIRN "Fillimi i fundit për kontratën e HEC-eve në lumin Osum" . BIRN Albania / Reporter.al. 2018-02-19 .
- ↑Official Record "HEC-et në Osum, MIE nis procedurat për zgjidhjen e kontratës" . Ministry of Infrastructure and Energy (MIE). 2018-02-19 (Article 12 Concession Contract Termination Notice (19.02.2018)) .
- ↑BIRN "Gjykata Administrative vulos anulimin e HEC-eve në kanionet e Osumit" . BIRN Albania / Reporter.al. 2018-07-31 .
- ↑Press "Shoqëria civile nis betejën në gjykata për projektet mjedisore" . Porta Vendore. 2019-04-26 .
- ↑Press "Koncesionarët "mësyjnë" gjykatën, markimi i karburanteve, HEC-et mbi Osum kundër institucioneve" . Monitor.al. 2019-03-19 .
- ↑Court "Shpallur më 21.10.2025 — Gjykata Administrative e Apelit" . Gjykata Administrative e Apelit (Administrative Court of Appeal). 2025-10-21 .
- ↑Court "Për shqyrtim në dhomë këshillimi - Administrative (Çështja Nr. 31001-00320-00-2026)" . Gjykata e Lartë e Republikës së Shqipërisë (Supreme Court of Albania). 2026 (Case No. 31001-00320-00-2026) .
- ↑Press "Rama zotohet: Asnjë HEC aty ku cenohet turizmi" . Top Channel. 2018-02-23 .
Revision history
- 2026-11-23 — Initial corporate profile detailing QKB registration (NIPT L39604401K), 2 AF sh.p.k. ownership, 2013–2016 concession expansion, 2018 permit revocation, and 2018–2026 court challenges.